Tracc Civil engaged us to carry out the complete sewer installation on Andrea Drive, encompassing trench excavation, precise pipe laying, comprehensive testing. The project was executed efficiently, meeting all quality standards and delivered on schedule.

Project planning

Detailed site surveys, phased trenching and pipe laying, coordinated testing and efficient site restoration to ensure on-time, safe and compliant completion.

Planning

Securing permits, mobilizing equipment and materials, setting up traffic and safety controls and conducting site inductions to ensure a smooth start to the works.

De-watering

Was strategically executed through the installation of well points and sump pumps, effectively controlling groundwater infiltration to ensure safe, dry, and stable trench conditions throughout construction.

Problem solving

Involved quickly adapting to unexpected groundwater inflows and site conditions by modifying de-watering methods and adjusting excavation sequences to maintain progress and safety.

Challenges

Stay Wires

Planned work sequencing and downsized in equipment to safely navigate around stay wires

Communication Cables

Locating and marking all services, using vacuum excavation and coordinating with providers to prevent damage.

Over Head Power Lines

Conduct thorough site assessments and use clear communication protocols to ensure safe operations around power infrastructure.

Open Excavations

Implementing trench support systems, safe access points and clear exclusion zones around the open excavation.