← Projects

Autonomous Towers

Wheatbelt, Western Australia · 2021 · Sub Contractor

Our company was engaged by Pilbara Networks to complete detailed earthworks for autonomous towers at Mesa A,J,and H near Pannawonika, ensuring optimal site preparation.

Remote mobilisation

Transporting tipper trucks and skid steers to the site for efficient earthmoving operations.

Site preparation

Utilising skid steers for grading and leveling the terrain needed for autonomous tower installations.

Material transport

Employing tipper trucks to transport soil and other materials to and from the site for earthworks.

Operational oversight

Ensuring all equipment is operated safely and efficiently, adhering to project timelines and safety regulations.

Challenges

Access limitations

Difficult terrain and narrow access routes restricted the movement of heavy machinery and equipment.

Environmental considerations

Compliance with environmental regulations added complexity to site operations and necessitated additional monitoring.

Exisiting infrastructure

Proximity to existing infrastructure required careful planning and coordination.

Safety hazards

Identifying and mitigating potential safety hazards on-site was a continuous priority to protect workers and equipment.