← Projects

Henley Brook - Water Main

Henley Brook, Western Australia · 2025 · Sub Contractor

We were engaged by Tracc Civil to install a water main in tightly congested areas with numerous existing utilities and road build-ups. The project required careful coordination and precise excavation to safely navigate around obstacles while minimizing disruption.

Project planning

With detailed utility mapping, careful excavation scheduling and traffic management to navigate tight, congested areas safely.

Problem solving

involved proactive utility coordination, adaptive excavation techniques and real-time communication to quickly address unexpected site challenges and maintain project flow.

Documentation

BYDA services located and marked prior to starting and as-built documentation prepared in accordance with design drawings. Dig permits,SWIMS, spotter in place.

Sustainable practices

Minimizing site disturbance and optimizing resource efficiency throughout installation.

Challenges

Underground Services

Maintain flexible design plans and rapid decision-making protocols to adapt to changes onsite.

Property Damage

Use non-invasive excavation methods like vacuum excavation near sensitive utilities to prevent damage.

Traffic Management Plans

Encountered restricted access to certain sections of the road, hindering equipment movement and working under traffic management.

Other Work Forces

Establish a centralized communication system and regular coordination meetings to ensure all parties are informed and aligned.