We were engaged by Tracc Civil to assist with the installation of high voltage and low voltage cables. The scope involved careful trenching, cable laying, and coordination around existing underground services to ensure safety and compliance with electrical standards.

Project planning

Focused on detailed site assessment, sequencing of HV and LV cable installations and ensuring all works adhered to safety regulations and service authority requirements.

Problem solving

Adapting installation methods to navigate existing services, addressing access constraints and ensuring compliance with electrical safety standards throughout the project.

Safety measures

With strict safety measures including exclusion zones, PPE and live service identification protocols in place.

Inspection & testing

Inspection and testing were carried out throughout the project to verify correct cable placement, ensure compliance with electrical standards and confirm system integrity before commissioning.

Challenges

Plant Interaction

Causing site congestion and safety risks. Conflicting schedules leading to delays.

Materials Delay

We implemented proactive procurement planning, maintained regular communication with suppliers and kept a buffer stock of critical items on site to avoid work stoppages.

Underground Services

Using vacuum excavation and trained personnel to safely expose and handle existing cables.

Inclement Weather

To manage inclement weather, we implemented flexible scheduling, used protective coverings and drainage systems onsite and monitored forecasts closely to adjust work plans and ensuresafety.