← Projects

Mandurah Subdivision

Mandurah, Western Australia · 2022 · Sub Contractor

We were engaged by Civcon for the Mandurah Subdivision, we installed sewer lines alongside water pressure mains and gas, utilizing shoring boxes for safe excavation.

Utility Installation

Installed sewer lines in conjunction with water pressure mains and gas lines.

Safety Measures

Implemented shoring boxes to ensure safe excavation practices and minimise risk management.

Collaboration

Worked closely with other contractors to coordinate utility installations effectively.

Site Coordination

Ensured effective coordination with other utilities and contractors in a busy traffic area.

Challenges

Traffic Management

Navigating heavy traffic along the main road required careful planning and coordination.

Soil Conditions

Encountered challenging soil conditions that impacted excavation and installation processes.

Limited Access

Restricted access to certain areas complicated equipment mobilisation and material delivery.

Utility Conflicts

Faced unexpected conflicts with existing underground utilities, necessitating design adjustments.