Pile and Keel - Sewer Main

Perth, Western Australia · 2025 · Sub Contractor

We were engaged by Tracc Civil to install the sewer main using pile and keel construction methods. This approach was selected to ensure stability in challenging ground conditions while minimizing disruption to the surrounding area. The project was completed efficiently, meeting all quality and safety standards within the scheduled time frame.

Project planning

Conduct a thorough assessment of the existing road conditions, Complying with working corridors and minimum interference with live flowing traffic.

Form Work Preparation

With precise measurements, sturdy bracing, and thorough inspections before concrete pouring.

Quality Assurance

Quality assurance for pile and keel on inverts and pipe preparation involved rigorous inspections, accurate alignment checks and verification of materials and workmanship to ensure compliance with design specifications.

Problem Solving

Addressing unexpected soil conditions with adaptive piling techniques and adjusting pipe alignment to accommodate site constraints without compromising structural stability.

Challenges

Limited Site Access

Utilize compact, specialized machinery and plan logistics for efficient equipment movement.

Environmental Restrictions

Implement environmental management plans including erosion control and site restoration.

Precise Alignment Requirements

Employ laser-guided systems, Inverts and regular surveying to ensure accuracy.

Unstable Soil Conditions

Conduct comprehensive geo-technical investigations and apply soil stabilization techniques.