Andrea Drive Stage 2
Sub Contractor · 2025
We were engaged to complete the Andrea Stage 2 sewer installation, utilizing shoring boxes and steel plates for trench support. This approach provided enhanced safety and stability during excavation and pipe installation.
- 01 Project planning
- 02 Safety management
- 03 Site preperation
- 04 Compliance
Project planning
Planned with a focus on utility mapping, safe excavation using shoring and steel plates, efficient sewer installation and timely restoration while meeting all safety and compliance requirements.
Safety management
Maintained through daily pre-starts, exclusion zones, proper PPE, and strict adherence to Safe Work Method Statements (SWMS).
Site preperation
Included service locating (BYDA), traffic control setup, and equipment mobilisation prior to commencing works.
Compliance
Ensured by following all relevant codes, local council requirements and utility provider standards.
Challenges
Under Ground Services
Conduct detailed utility surveys and potholing to accurately locate services before digging.
Limited Work Space
Use compact machinery and schedule just-in-time deliveries to reduce onsite congestion.
Unstable Ground
Use shoring boxes and steel plates to support trench walls and prevent collapse.
Adverse Weather Conditions
Develop a weather contingency plan with flexible scheduling and site protection measures.
More projects
Continue through the portfolio — previous and next programmes.

Gin Gin - Stormwater
We were engaged to assist with the construction of stormwater infrastructure and driveway crossovers within the Gin Gin civil works project. The scope involved forming and finishing stormwater manhole benching to ensure correct water flow, along with constructing concrete driveway crossovers connecting properties to the road network.
View project
Wildtown Enterprises - Sewer
We were engaged by the developer of Woolworths, located on the corner of Swaisvale Road and Repton Road, Dayton to install sewer infrastructure under challenging wet conditions. The project required de-watering and trench stabilization techniques to ensure safe and efficient installation.
View project