Hepburn Ave Drainage
Awarded · 2024
Engaged by Hillary’s Shire for the Hepburn Avenue road upgrade and stormwater improvement project to enhance infrastructure and ensure better drainage and road safety.
- 01 Supply of Materials
- 02 Project Integration
- 03 Live Cut-in
- 04 Completion Goal
Supply of Materials
Procurement of all necessary materials for the project.
Project Integration
Seamless connection to existing stormwater systems.
Live Cut-in
Removal of 750mm RCP (Reinforced Concrete Pipe). Install base and 1200 liner executing live cut-in operations to minimise service disruption.
Completion Goal
Achieving operational functionality for the upgraded junction.
Challenges
Service disruptions
Potential interruptions to existing utilities during the live cut-in process.
Traffic management
Navigating high traffic volumes while ensuring safety for both workers and motorists.
Limited space
Restricted working area affecting equipment access and manoeuvrability.
Soil stability
Unforeseen soil conditions requiring additional support measures during excavation.
More projects
Continue through the portfolio — previous and next programmes.

Henley Brook Drainage
The Henley Brook project involves the installation of deep sewer drainage systems, utilising shoring boxes to ensure safety and stability during excavation.
View project
Hazelmere Industrial Sump
The Hazelmere Industrial Sump project aims to enhance stormwater management, improve drainage efficiency, and mitigate flood risks in the industrial area through effective design and implementation.
View project