Yanchep Golf Estate
Sub Contractor · 2024
The project involves footpath preparation, lot trimming, and limestone carpark installation to enhance accessibility and functionality within the RJV Golf Estate.
- 01 Preparation
- 02 Lot trimming
- 03 Limestone carparks
- 04 Site grading
Preparation
Excavation and grading for footpaths throughout the estate.
Lot trimming
Clearing and leveling lots for proper drainage and aesthetics.
Limestone carparks
Installing a stable limestone base for car parks
Site grading
Adjusting contours to facilitate drainage and access.
Challenges
Weather impact
Rain and wet conditions delaying progress and affecting site safety.
Safety hazards
Ensuring safety protocols were followed amid changing site conditions.
Existing infrastructure
Navigating around pre-existing utilities and infrastructure that limited available workspace
More projects
Continue through the portfolio — previous and next programmes.

Hazelmere Industrial Sump
The Hazelmere Industrial Sump project aims to enhance stormwater management, improve drainage efficiency, and mitigate flood risks in the industrial area through effective design and implementation.
View project
Elavale Sub-Division
Engaged with RJV for the elavale project, utilizing our road crew to provide precise grading and site preparation delivering accurate grading and site preparation to improve efficiency while prioritizing safety.
View project