The project involves installing 1,500 meters of V-drains to enhance stormwater management and drainage efficiency in the Gin Gin Shire.
- 01 Drainage installation
- 02 Excavation works
- 03 Material supply
- 04 Bobcat utilisation
Drainage installation
Laying out and installing V-drains across designated areas.
Excavation works
Utilising excavators for site preparation and trenching.
Material supply
Sourcing and supplying all necessary materials for the installation.
Bobcat utilisation
Using Bobcats for efficient handling and movement of materials.
Challenges
Equipment limitations
Managing operational efficiency with Bobcats and excavators in confined spaces.
Worker safety
Navigated existing underground utilities that posed risks to installation and required careful planning using shoring boxes in congested areas.
Traffic management
Navigating traffic disruptions and coordinating with local authorities for road management.
Access Issues
Limited access to certain areas affecting the deployment of equipment and materials.
More projects
Continue through the portfolio — previous and next programmes.

Jurien Bay 225 Sewer System
The project involves the installation of a 5.5-meter deep sewer system in Jurien Bay, addressing challenges posed by a high water table and dewatering needs.
View project
Champion Lakes Stormwater
The project involved stormwater installation in Champion Lakes, addressing clay soil conditions and fluctuating water tables to ensure effective drainage solutions.
View project