Jurien Bay 225 Sewer System
Awarded · 2024
The project involves the installation of a 5.5-meter deep sewer system in Jurien Bay, addressing challenges posed by a high water table and dewatering needs.
- 01 Heritage assessment
- 02 Deep sewer install
- 03 Dewatering solutions
- 04 Excavation works
Heritage assessment
Conducting assessments to identify and protect any heritage sites.
Deep sewer install
Excavating and installing a 5.5-meter deep sewer line connecting in to a live connection.
Dewatering solutions
Implementing systems to manage high water table conditions effectively.
Excavation works
Using appropriate machinery for deep excavation in challenging conditions.
Challenges
High water table
Encountered a high water table that complicated excavation and required additional dewatering measures.
Existing Infrastructure
Navigated existing underground utilities that posed risks to installation and required careful planning using shoring boxes in congested areas.
More projects
Continue through the portfolio — previous and next programmes.

Cheriton Road - Drainage
Supply materials and bulk bill for storm water upgrade from the corner of Whakea Road heading north along Cheriton Road in Gin Gin enhancing the water flow capacity and improving mother natures balance for the residents of Gin Gin.
View project
Gin Gin Storm Water
The project involves installing 1,500 meters of V-drains to enhance stormwater management and drainage efficiency in the Gin Gin Shire.
View project